Cost-benefit analysis

Financial and economic analysis of the investment, with performance indicators, sensitivity and risk matrix, in the format required by funding bodies.

from 1.500 €excl. VAT
15 daysstandard lead time
RO / ENdelivery language
Get a price estimatePricing

What the deliverable looks like

Cost-benefit analysis: NPV sensitivity Base NPV: +€1.18 million Energy price ±15% -42 % +42 % Capital cost ±10% -24 % +24 % Yield ±8% -22 % +22 % Discount rate ±2 pp -18 % +15 % O&M costs ±20% -9 % +9 % 12-month delay -14 % NPV falls NPV rises

scroll sideways for the full drawing

The sensitivity analysis says which variable can overturn the project. In the example above, the energy price matters almost twice as much as the capital cost. The funding body reads this chart before any other chapter, because it shows whether the project survives a bad year.

Pricing

Valoarea investițieiFee fromLead time
under €3 million1.500 €15 days
€3 – 10 million2.500 €20 days
over €10 millioncustom quote—

Prices exclude VAT. Rush delivery, plus 30 %. Bilingual delivery, plus 15 %. Schemes with several grid connection permits are priced per subproject.

Not included: permit and approval fees, topographic survey, geotechnical survey.

What you receive

What it contains

  • Identification of the investment and definition of objectives, including the without-investment scenario against which it is compared.
  • Option analysis and selection of the variant to be analysed.
  • Financial analysis: investment costs, operating costs, revenues, residual value, discounted cash flow, financial NPV, financial IRR, benefit-cost ratio, financial sustainability over the analysis horizon.
  • Economic analysis, where the funding body requires it: fiscal corrections, shadow prices, monetised externalities (avoided emissions, time saved), economic NPV, economic IRR.
  • Sensitivity analysis: critical variables, switching values, elasticity of the indicators.
  • Risk analysis: probability-impact matrix, prevention and mitigation measures.
  • Conclusions, in the format required by the applicant's guide of the targeted programme.

What you send us

  • The general estimate or the investment estimate and the technical description of the project.
  • Known operating data: revenues, costs, tariffs, the time horizon required by the funding body.

Note: the cost-benefit analysis is usually part of the feasibility study. As a separate service it makes sense when the study already exists and the funding body asks for the analysis redone under its methodology.

How we work

Scoping call

Fifteen minutes about the project and the purpose of the study. This is where we tell you whether it makes sense before you pay anything.

Firm quote and contract

Fixed price, fixed deadline, a clear list of the data you send us. First instalment of 50 % on signing.

Analysis

Site, legal status of the land, grid connection capacity, environmental and planning constraints.

Drafting and scenarios

We build the technical and economic options, compare them and justify the recommendation.

Handover

Documentation signed by the licensed specialists, plus a session where we walk you through the conclusions. Remaining 50 % on delivery.

Who signs the study

Every document carries the name and the licence number of the person responsible for it.

Technical lead

[name, to be filled in]

Over 17 years in energy installation design and renewable project development, from concept to ready to build.

Financial lead

[name, to be filled in]

Over 25 years in financial analysis and investment structuring. The economic section is not subcontracted.

Review and certification

ANRE-licensed specialists and project reviewers

Permanent collaborators, named in each document according to the type of work.

Frequently asked questions

Who prepares feasibility studies for solar parks in Romania?

PMD Energy prepares technical and economic feasibility studies for photovoltaic projects, storage systems and charging stations under HG 907/2016, with ANRE-licensed designers. Active since 2011, based in Tulcea county, working nationwide.

How much does a feasibility study cost?

Between €900 for a site screening and €8,000 for a solar park above 5 MW. Starting fees are published on every service page. For large projects we issue a custom quote within 24 hours.

How long until I receive the study?

Between 20 and 35 working days from receiving the complete data, depending on complexity. In rush mode the lead time drops to about half, with a 30% surcharge.

Do I get the study in English too?

Yes. We deliver the documentation in Romanian and English, for foreign investors or lenders. 15% surcharge on the fee.

What happens if the funding body asks for clarifications?

We answer clarification requests at no extra cost, for documentation we prepared.

How do I pay?

By pro forma invoice and bank transfer. 50% on signing the contract and 50% on delivery of the documentation. We do not take online payments.

Related services

Find out what your study costs

Four questions, two minutes, one figure. No call required first.

Get a price estimateCall us instead