Feasibility studies › Grid connection solution study

Documentation · from 18.000 €

Grid connection solution study

Analysis of the grid connection options, with electrical calculations, single-line diagrams and the point of delimitation. The document on which the distribution operator (DSO) issues the technical connection permit (ATRGrid connection permit (ATR)The document by which the network operator confirms that you may connect a given capacity at a given point.Read more ›).

from 18.000 €excl. VAT
60 daysstandard lead time
RO / ENdelivery language
Get a price estimatePricing

What the deliverable looks like

Schemă monofilară, parc fotovoltaic 1 MW Șir module 24 × 620 Wp Șir module 24 × 620 Wp Șir module 24 × 620 Wp c.c. · 1.100 V Invertoare 4 × 250 kW 800 V Tablou general protecții Trafo 1.000 kVA 0,8 / 20 kV punct de delimitare Rețea LEA 20 kV conform ATR

glisează lateral pentru desenul complet

Schema monofilară face parte din părțile desenate ale studiului. Valorile de mai sus sunt un exemplu pentru un parc de 1 MW; configurația reală rezultă din analiza de racordare și din avizul tehnic emis de operatorul de rețea.

Pricing

Putere instalatăFee fromLead time
under 3 MW18.000 €60 days
3 – 20 MW22.000 €60 days
over 20 MWcustom quote60 days

Prices exclude VAT. Rush delivery, plus 30 %. Bilingual delivery, plus 15 %. Schemes with several grid connection permits are priced per subproject.

Not included: permit and approval fees, topographic survey, geotechnical survey.

What you receive

Written parts

  • Installation data: installed capacity, requested export power, equipment type, operating regime.
  • Analysis of the existing network in the area: available substations and lines, suitable voltage level, remaining capacity.
  • At least two compared connection options: connection point, route length, grid reinforcement works required.
  • Electrical calculations: power flow, voltage drops, short-circuit currents, equipment verification.
  • Connection cost estimate for each option, split between works borne by the operator and by you.
  • Recommended option and the list of works within the user installation.

Drawings

  • Single-line diagram of the connection installation, for each option.
  • Site plan with the line or cable route to the connection point.
  • Metering diagram and the point of delimitation.

What you send us

  • The connection application filed with the operator, or the identification data of the consumption or generation site.
  • Land documents and the topographic survey, if available.

Note: the connection study is filed with the distribution operator, which approves it and issues the technical connection permit. The lead time also depends on the operator's response, not only on us.

How we work

Scoping call

Fifteen minutes about the project and the purpose of the study. This is where we tell you whether it makes sense before you pay anything.

Firm quote and contract

Fixed price, fixed deadline, a clear list of the data you send us. First instalment of 50 % on signing.

Analysis

Site, legal status of the land, grid connection capacity, environmental and planning constraints.

Drafting and scenarios

We build the technical and economic options, compare them and justify the recommendation.

Handover

Documentation signed by the licensed specialists, plus a session where we walk you through the conclusions. Remaining 50 % on delivery.

Who signs the study

Every document carries the name and the licence number of the person responsible for it.

Technical lead

[name, to be filled in]

Over 17 years in energy installation design and renewable project development, from concept to ready to build.

Financial lead

[name, to be filled in]

Over 25 years in financial analysis and investment structuring. The economic section is not subcontracted.

Review and certification

ANRE-licensed specialists and project reviewers

Permanent collaborators, named in each document according to the type of work.

Frequently asked questions

Who prepares feasibility studies for solar parks in Romania?

PMD Energy prepares technical and economic feasibility studies for photovoltaic projects, storage systems and charging stations under HG 907/2016, with ANRE-licensed designers. Active since 2011, based in Tulcea county, working nationwide.

How much does a feasibility study cost?

Between €900 for a site screening and €8,000 for a solar park above 5 MW. Starting fees are published on every service page. For large projects we issue a custom quote within 24 hours.

How long until I receive the study?

Between 20 and 35 working days from receiving the complete data, depending on complexity. In rush mode the lead time drops to about half, with a 30% surcharge.

Is a feasibility study the same as a grid connection study?

No. The feasibility study compares at least two technical and economic scenarios and supports the investment decision. The connection study analyses only the grid connection and is the basis for the technical connection permit. Many projects need both, in that order.

Do I get the study in English too?

Yes. We deliver the documentation in Romanian and English, for foreign investors or lenders. 15% surcharge on the fee.

What happens if the funding body asks for clarifications?

We answer clarification requests at no extra cost, for documentation we prepared.

How do I pay?

By pro forma invoice and bank transfer. 50% on signing the contract and 50% on delivery of the documentation. We do not take online payments.

Related services

Find out what your study costs

Four questions, two minutes, one figure. No call required first.

Get a price estimateCall us instead