ENERGY
RO

Feasibility studies › Modernisation Fund application

Funding · from 3.000 €

Modernisation Fund application

Feasibility study and technical-economic documentation for schemes financed from the Modernisation Fund, in the structure required by the applicant's guide.

from 3.000 €excl. VAT
25 daysstandard lead time
RO / ENdelivery language
Get a price estimatePricing

What the deliverable looks like

Modernisation Fund: funding structure 0 M€ 1 M€ 2 M€ 3 M€ 2.6 M€ 55 % PV park 3 MW 1.0 M€ 65 % Self-consumption 1 MW 3.4 M€ 45 % Storage 10 MWh grant (aid intensity) own contribution, eligible non-eligible costs intensities are examples; real values come from the call guide

scroll sideways for the full drawing

What the fund pays for and what stays with you. The study classifies each cost as eligible or not, applies the intensity from the guide and calculates the indicators used for scoring: cost per MW, avoided emissions, grant-to-result ratio. This is where the ranking is won or lost.

Pricing

Valoarea investițieiFee fromLead time
under €3 million3.000 €25 days
€3 – 10 million5.000 €30 days
over €10 millioncustom quote—

Prices exclude VAT. Rush delivery, plus 30 %. Bilingual delivery, plus 15 %. Schemes with several grid connection permits are priced per subproject.

Not included: permit and approval fees, topographic survey, geotechnical survey.

What you receive

What it contains

  • The feasibility study in the HG 907/2016Government Decision 907/2016 (HG 907/2016)The Romanian regulation that sets the mandatory content of technical and economic documentation.Read more › structure, adapted to the applicant's guide of the targeted call.
  • Calculation of the indicators required by the guide: installed capacity, estimated annual output, avoided CO2 emissions, cost per installed MWMegawatt (MW)One thousand kilowatts. The usual unit for energy parks.Read more ›, ratio of requested funding to result.
  • Check of the eligibility criteria and the scoring grid, with recommendations to maximise the score before submission.
  • Cost-benefit analysis under the funding body's methodology, demonstrating the need for aid.
  • Procurement plan and implementation schedule within the call deadlines.
  • Support in completing the technical and financial sections of the funding application.

Drawings

  • The feasibility study plans, with the additional details required by the guide.

What you send us

  • Site documents, the connection permit or the connection study.
  • The applicant's identification data and the financial statements required by the guide.

Note: guides change from call to call. We work on the version in force at the contract date and adapt the documentation if the guide changes before submission.

How we work

Scoping call

Fifteen minutes about the project and the purpose of the study. This is where we tell you whether it makes sense before you pay anything.

Firm quote and contract

Fixed price, fixed deadline, a clear list of the data you send us. First instalment of 50 % on signing.

Analysis

Site, legal status of the land, grid connection capacity, environmental and planning constraints.

Drafting and scenarios

We build the technical and economic options, compare them and justify the recommendation.

Handover

Documentation signed by the licensed specialists, plus a session where we walk you through the conclusions. Remaining 50 % on delivery.

Who signs the study

Every document carries the name and the licence number of the person responsible for it.

Technical lead

[name, to be filled in]

Over 17 years in energy installation design and renewable project development, from concept to ready to build.

Financial lead

[name, to be filled in]

Over 25 years in financial analysis and investment structuring. The economic section is not subcontracted.

Review and certification

ANRE-licensed specialists and project reviewers

Permanent collaborators, named in each document according to the type of work.

Frequently asked questions

Who prepares feasibility studies for solar parks in Romania?

PMD Energy prepares technical and economic feasibility studies for photovoltaic projects, storage systems and charging stations under HG 907/2016, with ANRE-licensed designers. Active since 2011, based in Tulcea county, working nationwide.

How much does a feasibility study cost?

Between €900 for a site screening and €8,000 for a solar park above 5 MW. Starting fees are published on every service page. For large projects we issue a custom quote within 24 hours.

How long until I receive the study?

Between 20 and 35 working days from receiving the complete data, depending on complexity. In rush mode the lead time drops to about half, with a 30% surcharge.

Do I get the study in English too?

Yes. We deliver the documentation in Romanian and English, for foreign investors or lenders. 15% surcharge on the fee.

What happens if the funding body asks for clarifications?

We answer clarification requests at no extra cost, for documentation we prepared.

How do I pay?

By pro forma invoice and bank transfer. 50% on signing the contract and 50% on delivery of the documentation. We do not take online payments.

Related services

Find out what your study costs

Four questions, two minutes, one figure. No call required first.

Get a price estimateCall us instead