Feasibility studies › EV charging feasibility study

Technology · from 1.500 €

EV charging feasibility study

Study for charging stations, with analysis of the power available at the connection, the usage profile and the pricing model.

from 1.500 €excl. VAT
15 daysstandard lead time
RO / ENdelivery language
Get a price estimatePricing

What the deliverable looks like

Charging stations: daily power demand 0 100 200 300 400 power available at connection · 250 kW peak 340 kW → dynamic load management 00:00 06:00 12:00 18:00 23:00 kW requested by 6 DC points

scroll sideways for the full drawing

Power demand against what the grid provides. When the peak exceeds the available power there are two options: pay for grid reinforcement or dynamically limit each point. The study compares them in money and in lost charging time, on the site's actual traffic profile.

Pricing

Putere instalatăFee fromLead time
under 1 MW1.500 €15 days
1 – 3 MW2.500 €20 days
over 3 MWcustom quote—

Prices exclude VAT. Rush delivery, plus 30 %. Bilingual delivery, plus 15 %. Schemes with several grid connection permits are priced per subproject.

Not included: permit and approval fees, topographic survey, geotechnical survey.

What you receive

Written parts

  • Site analysis: traffic, distance to main roads, existing competition, average dwell time.
  • Choice of power and number of charging points: AC, fast DC or ultra-fast DC, with dynamic load management.
  • Connection analysis: power available at the existing point, need for a new transformer station, connection cost and lead time.
  • Estimated usage profile and revenue from energy sales, with the recommended pricing model.
  • General estimate and financial analysis: investment, operating costs, payback, NPV, IRR.
  • Eligibility check against the funding schemes active at the time of the study.

Drawings

  • Site plan with parking bays, stations, cable routes and the transformer station.
  • Single-line diagram from the connection point to each station.

What you send us

  • Land documents or lease agreement and the parking layout plan.
  • Currently contracted power and the site's latest energy invoice.

How we work

Scoping call

Fifteen minutes about the project and the purpose of the study. This is where we tell you whether it makes sense before you pay anything.

Firm quote and contract

Fixed price, fixed deadline, a clear list of the data you send us. First instalment of 50 % on signing.

Analysis

Site, legal status of the land, grid connection capacity, environmental and planning constraints.

Drafting and scenarios

We build the technical and economic options, compare them and justify the recommendation.

Handover

Documentation signed by the licensed specialists, plus a session where we walk you through the conclusions. Remaining 50 % on delivery.

Who signs the study

Every document carries the name and the licence number of the person responsible for it.

Technical lead

[name, to be filled in]

Over 17 years in energy installation design and renewable project development, from concept to ready to build.

Financial lead

[name, to be filled in]

Over 25 years in financial analysis and investment structuring. The economic section is not subcontracted.

Review and certification

ANRE-licensed specialists and project reviewers

Permanent collaborators, named in each document according to the type of work.

Frequently asked questions

Who prepares feasibility studies for solar parks in Romania?

PMD Energy prepares technical and economic feasibility studies for photovoltaic projects, storage systems and charging stations under HG 907/2016, with ANRE-licensed designers. Active since 2011, based in Tulcea county, working nationwide.

How much does a feasibility study cost?

Between €900 for a site screening and €8,000 for a solar park above 5 MW. Starting fees are published on every service page. For large projects we issue a custom quote within 24 hours.

How long until I receive the study?

Between 20 and 35 working days from receiving the complete data, depending on complexity. In rush mode the lead time drops to about half, with a 30% surcharge.

Do I get the study in English too?

Yes. We deliver the documentation in Romanian and English, for foreign investors or lenders. 15% surcharge on the fee.

What happens if the funding body asks for clarifications?

We answer clarification requests at no extra cost, for documentation we prepared.

How do I pay?

By pro forma invoice and bank transfer. 50% on signing the contract and 50% on delivery of the documentation. We do not take online payments.