Feasibility studies › Industrial self-consumption study

Technology · from 1.800 €

Industrial self-consumption study

Study for a photovoltaic system sized on the company's real consumption profile, with the calculated bill savings and payback period.

from 1.800 €excl. VAT
15 daysstandard lead time
RO / ENdelivery language
Get a price estimatePricing

What the deliverable looks like

Self-consumption: output and load on a typical day 0 100 200 300 400 00:00 06:00 12:00 18:00 23:00 kW PV output plant load self-consumed exported surplus

scroll sideways for the full drawing

Overlaying output on consumption is the calculation that sets the system size. Example for a daytime-load plant: almost all output up to 330 kW is used on site, the excess goes to the grid at a much lower price. The optimal capacity comes from here, not from the roof area.
Amortizarea investiției, 1 MWp -800 -400 0 +400 +800 +1200 an 0 an 5 an 10 an 15 an 20 prag de rentabilitate · anul 7,4 mii € cumulat

glisează lateral pentru desenul complet

Graficul de amortizare arată când investiția se întoarce. Exemplu pentru 1 MWp, cu 700.000 € investiți și 95.000 € venit net anual: pragul e atins în anul 7,4. Studiul calculează aceeași curbă în trei scenarii, inclusiv unul prudent, fiindcă finanțatorii se uită la cel prudent.

Pricing

Putere instalatăFee fromLead time
under 0.5 MW1.800 €15 days
0.5 – 2 MW2.800 €20 days
over 2 MWcustom quote—

Prices exclude VAT. Rush delivery, plus 30 %. Bilingual delivery, plus 15 %. Schemes with several grid connection permits are priced per subproject.

Not included: permit and approval fees, topographic survey, geotechnical survey.

What you receive

Written parts

  • Analysis of the consumption profile from invoices and, where available, the hourly load curve from the supplier.
  • System sizing on real consumption: the capacity at which self-consumption stays high, without oversizing that is lost to the grid.
  • Hourly yield simulation overlaid on consumption: self-consumed energy, energy fed into the grid, energy still purchased.
  • Bill savings calculated with your actual energy price, including regulated components.
  • A storage variant, where the consumption profile justifies it.
  • Financial analysis: investment, annual savings, payback, 20-year NPV, sensitivity to energy price.
  • Check of prosumer or producer conditions, depending on the resulting capacity.

Drawings

  • Layout plan on the roof or on the ground, with row orientation and tilt.
  • Single-line diagram with the connection point in the existing installation.
  • Production and consumption charts for a typical summer and winter day.

What you send us

  • The last 12 energy invoices or the load-curve export from your supplier account.
  • Roof or land plan and, if available, the structural assessment of the building.

How we work

Scoping call

Fifteen minutes about the project and the purpose of the study. This is where we tell you whether it makes sense before you pay anything.

Firm quote and contract

Fixed price, fixed deadline, a clear list of the data you send us. First instalment of 50 % on signing.

Analysis

Site, legal status of the land, grid connection capacity, environmental and planning constraints.

Drafting and scenarios

We build the technical and economic options, compare them and justify the recommendation.

Handover

Documentation signed by the licensed specialists, plus a session where we walk you through the conclusions. Remaining 50 % on delivery.

Who signs the study

Every document carries the name and the licence number of the person responsible for it.

Technical lead

[name, to be filled in]

Over 17 years in energy installation design and renewable project development, from concept to ready to build.

Financial lead

[name, to be filled in]

Over 25 years in financial analysis and investment structuring. The economic section is not subcontracted.

Review and certification

ANRE-licensed specialists and project reviewers

Permanent collaborators, named in each document according to the type of work.

Frequently asked questions

Who prepares feasibility studies for solar parks in Romania?

PMD Energy prepares technical and economic feasibility studies for photovoltaic projects, storage systems and charging stations under HG 907/2016, with ANRE-licensed designers. Active since 2011, based in Tulcea county, working nationwide.

How much does a feasibility study cost?

Between €900 for a site screening and €8,000 for a solar park above 5 MW. Starting fees are published on every service page. For large projects we issue a custom quote within 24 hours.

How long until I receive the study?

Between 20 and 35 working days from receiving the complete data, depending on complexity. In rush mode the lead time drops to about half, with a 30% surcharge.

Do I get the study in English too?

Yes. We deliver the documentation in Romanian and English, for foreign investors or lenders. 15% surcharge on the fee.

What happens if the funding body asks for clarifications?

We answer clarification requests at no extra cost, for documentation we prepared.

How do I pay?

By pro forma invoice and bank transfer. 50% on signing the contract and 50% on delivery of the documentation. We do not take online payments.

Related services

Find out what your study costs

Four questions, two minutes, one figure. No call required first.

Get a price estimateCall us instead