ENERGY
RO

Feasibility studies › Site screening

Documentation · from 900 €

Site screening

Quick check of a site: solar resource, legal status of the land, grid connection capacity and planning constraints. It tells you whether it is worth continuing.

from 900 €excl. VAT
7 daysstandard lead time
RO / ENdelivery language
Get a price estimate

What the deliverable looks like

Site screening: the scoring grid Solar resource 92 1.340 kWh/kWp Land legal status 80 non-urban, class IV Planning 55 zonal plan needed Connection capacity 35 20 kV substation at 6 km, reserved Environment 70 2 km from protected area Usable area 85 14 ha → ~9 MWp score 0–100 go / no-go threshold verdict: proceed, conditional on capacity reservation

scroll sideways for the full drawing

The screening ends with a grid, not a report to read to the end. Six criteria, each with its evidence, and a verdict. The example above is typical for Dobrogea: the land is excellent, the problem is the grid. You learn this in seven days, before signing the pre-contract.

Pricing

ServiceFee fromLead time
any size900 €7 days

Prices exclude VAT. Rush delivery, plus 30 %. Bilingual delivery, plus 15 %. Schemes with several grid connection permits are priced per subproject.

Not included: permit and approval fees, topographic survey, geotechnical survey.

What you receive

What we check

  • Solar resource and estimated specific yield for the site, from validated databases.
  • Legal status of the land: land use category, soil quality class, easements, need to remove it from the agricultural circuit.
  • Planning fit: what the general urban plan allows and whether a zonal plan is needed.
  • Connection capacity: substations in the area, likely voltage level, distance to the grid, public signals from the operator on available capacity.
  • Environmental constraints: protected areas, flood zones, distances to settlements and roads.
  • Usable area and the maximum capacity that can reasonably be installed.

What you receive

  • An 8–12 page report with a clear conclusion: worth continuing, worth continuing with conditions, or not worth it.
  • Order-of-magnitude estimate of the investment and the annual yield.
  • The list of identified risks and the recommended next steps, with their cost.

What you send us

  • The cadastral number or the coordinates of the site. That is all.

Note: the screening does not replace the feasibility study and is not filed with any authority. It is the tool for deciding whether to buy the land or to proceed with the full study, and its cost is deducted from the full study fee if you order it within 90 days.

How we work

Scoping call

Fifteen minutes about the project and the purpose of the study. This is where we tell you whether it makes sense before you pay anything.

Firm quote and contract

Fixed price, fixed deadline, a clear list of the data you send us. First instalment of 50 % on signing.

Analysis

Site, legal status of the land, grid connection capacity, environmental and planning constraints.

Drafting and scenarios

We build the technical and economic options, compare them and justify the recommendation.

Handover

Documentation signed by the licensed specialists, plus a session where we walk you through the conclusions. Remaining 50 % on delivery.

Who signs the study

Every document carries the name and the licence number of the person responsible for it.

Technical lead

[name, to be filled in]

Over 17 years in energy installation design and renewable project development, from concept to ready to build.

Financial lead

[name, to be filled in]

Over 25 years in financial analysis and investment structuring. The economic section is not subcontracted.

Review and certification

ANRE-licensed specialists and project reviewers

Permanent collaborators, named in each document according to the type of work.

Frequently asked questions

Who prepares feasibility studies for solar parks in Romania?

PMD Energy prepares technical and economic feasibility studies for photovoltaic projects, storage systems and charging stations under HG 907/2016, with ANRE-licensed designers. Active since 2011, based in Tulcea county, working nationwide.

How much does a feasibility study cost?

Between €900 for a site screening and €8,000 for a solar park above 5 MW. Starting fees are published on every service page. For large projects we issue a custom quote within 24 hours.

How long until I receive the study?

Between 20 and 35 working days from receiving the complete data, depending on complexity. In rush mode the lead time drops to about half, with a 30% surcharge.

Do I get the study in English too?

Yes. We deliver the documentation in Romanian and English, for foreign investors or lenders. 15% surcharge on the fee.

What happens if the funding body asks for clarifications?

We answer clarification requests at no extra cost, for documentation we prepared.

How do I pay?

By pro forma invoice and bank transfer. 50% on signing the contract and 50% on delivery of the documentation. We do not take online payments.

Related services

Find out what your study costs

Four questions, two minutes, one figure. No call required first.

Get a price estimateCall us instead